Jobs from our own record: what went down, how much of it and, where we have it, how long it took.
Home / Projects, with the numbers
25 jobs showing

Arches and a mosaic bar front, with Arch Construction. Toilets with Xpression Tile & Stone.

Pink tile, arched mirrors and brass basins.

With TWF. Earthy, warm, cut by hand.

Offices, reception, bathrooms and kitchens in porcelain, black trims.

Shelves fabricated from 12mm Premtool board and Elita Labs resin, with a 10mm Genesis LED track.

Service area and kitchen pass, tiled 5pm to 11pm, ready to serve coffee the next morning.

Bold, classy, and Sam's favourite of that year.

Old flooring out, timber areas boarded, screed levelled, then tiled.

Dark stone with an onyx floor. Ten out of ten prep from the contractor.

With King & Drury, on a Blue Flag beach with about a million visitors a year.

Checkerboard refurb with Cloud9 Contractors.

Four piece opus pattern, with the sea out of the window.

SPF1 adhesive and Coffee micromax 3 grout, bullnosed steps.

Non-slip floor tile continuing through the hallway.

Tiles cut to size, rounded to match the steel, edges polished and corners mitred.

Walls, floors, a full sauna and 3 ice baths.

Fan pattern, finished by the bricklayer pointing it in.

On a pedestal system, transforming the terrace.

With Matrix Diamond White on the walls, which we were not sure about until it was done.

Pale porcelain through a big kitchen and living space.

Checkerboard floor, black rapid-setting gritty grout.

Polished limestone under old oak beams.

A smart project, cut carefully round a range cooker.

Removed, primed, matted, tiled, tile skirtings. Months of planning with residents.

For washing down after sandy beach walks.
Metres and days, from jobs we have written up over the years.
| Job | Size | Time |
|---|---|---|
| Care home shower rooms and toilets | 196m² of 600x300 | 11 days |
| Accessible toilets, West Wittering Beach | 45m² | 2 days |
| Costa refurb, Poole | 30m² | 1 day |
| HMO | 120m² | 4 days |
| 9 new-build flats | 124m² | 2 weeks |
| Pub floor | Whole floor | 9 working days |
| Shop floor | 80m² | 3 evenings |
| Large format through a house | 900x900, one tiler | 4.5 days |